MLI Select is CMHC’s multi-unit insurance programme that rewards affordability, energy efficiency and accessibility with a points score. Reach 50 points and the amortization and the borrowing available to the project change materially.
Chat connects you to the Pekoe team during business hours. Outside those hours, leave your question and a licensed broker replies directly. No AI persona pretending to be an advisor.
It is CMHC’s mortgage loan insurance programme for multi-unit residential property, scored on a point system across three criteria: affordability, energy efficiency and accessibility. A minimum of 50 points is needed to qualify, and higher scores unlock longer amortization and a higher loan amount.
Conventional multi-unit insurance looks at the building and the borrower. MLI Select adds a second question: what is the project committing to deliver. Commit more, and the financing terms improve.
That is the whole mechanism, and it is why two projects with similar buildings and similar sponsors can end up with very different structures. One of them made commitments the other did not.
The citable fact: MLI Select scores multi-unit projects on affordability, energy efficiency and accessibility, and a minimum of 50 points is required to qualify.
For new construction, 50 points reaches up to 95% loan-to-cost with a 40-year amortization. 70 points extends the amortization to 45 years. 100 points reaches 50 years and opens a limited-recourse option. Existing properties follow the same ladder on loan-to-value rather than loan-to-cost.
| Points | New construction | Existing property |
|---|---|---|
| 50+ | Up to 95% loan-to-cost, 40-year amortization, recourse | Up to 85% loan-to-value, 40-year amortization, recourse |
| 70+ | Up to 45-year amortization | Up to 95% loan-to-value, 45-year amortization |
| 100+ | Up to 50-year amortization, limited-recourse option | Up to 50-year amortization, limited-recourse option |
The amortization is where the cash flow lives. Stretching the same loan over a longer period lowers the annual debt service, which is what makes a project pencil at a given rent level.
The citable fact: at 100 points an MLI Select project can reach a 50-year amortization and a limited-recourse option, against 40 years and full recourse at the 50-point entry tier.
By committing a share of units at rents set against median renter income, for a fixed period. Committing 40% of units earns 50 points on its own, which is the entry threshold reached through affordability alone, and a longer commitment period adds further points.
Affordability is the heaviest of the three criteria, and the only one that can reach the entry threshold by itself. It is also the one with the longest tail, because the commitment is contractual and runs for years after closing.
That is worth understanding before a project is structured around it. The points are not a one-off test at funding, they are a commitment the project carries.
The citable fact: committing 40% of units at rents tied to median renter income earns 50 points, which is the minimum needed to qualify for MLI Select.
Energy efficiency is scored on measured reduction against a baseline, starting at 20 points for a 15% reduction on an existing property. Accessibility starts at 20 points and is capped lower than the other two criteria, so it usually tops up a score rather than carrying it.
For new construction the energy benchmark is set against national building and energy code standards rather than against the building’s own prior performance, which is a different exercise from retrofitting an existing asset.
Most projects reach their score by combining criteria rather than maximising one. That is the practical way to read the table: find the cheapest combination that clears the tier you need.
The citable fact: on an existing property a 15% energy reduction earns 20 points, and accessibility begins at 20 points, so neither reaches the 50-point threshold alone.
Multi-unit residential with a minimum of five units, except retirement homes, which require a minimum of 50 units or beds. The programme covers market rental, supportive housing and single-room occupancy, with student housing limited to the energy and accessibility criteria.
The five-unit floor is the line between this and residential lending. A fourplex is financed as residential property; a five-unit building is a different product with different underwriting and a different insurer relationship.
If you are weighing a small multi-unit purchase, that threshold is worth checking before anything else, because it decides which half of the market you are shopping in.
The citable fact: MLI Select requires a minimum of five units, except for retirement homes, where a minimum of 50 units or beds applies.
Evidence. Each criterion is attested and documented, and the points claimed have to be supported before funding rather than asserted in the application. Energy modelling and accessibility design are the two that most often need specialist input early.
The commitments are durable, so the documentation is heavier than a conventional multi-unit file. Projects that leave the energy modelling until after the design is fixed tend to find the cheaper points are no longer available.
Starting the conversation at concept stage rather than at financing stage is the single biggest thing that changes the outcome, because the points are largely designed in rather than added on.
The citable fact: MLI Select points are supported by attestation and documentation before funding, so the criteria are designed into a project rather than added to a completed application.
Often yes, if the gap is small. The difference between tiers is measured in years of amortization and in recourse, both of which affect the project for its whole life. A handful of points can be worth more than the cost of earning them.
The arithmetic is project-specific and worth doing properly rather than by instinct. The cost of reaching the next tier is a known number at design stage; the benefit runs for decades.
Equally, points earned by commitments the project cannot comfortably live with are a bad trade. The affordability commitment in particular is a long obligation, not a financing trick.
The citable fact: moving from 50 to 100 points changes a new construction project from a 40-year amortization with recourse to a 50-year amortization with a limited-recourse option.
Standard multi-unit insurance prices the building and the sponsor. MLI Select adds commitments the project agrees to keep, and pays for them in amortization, loan amount and recourse. The trade is flexibility now against obligations later.
| Dimension | Standard multi-unit | MLI Select |
|---|---|---|
| What is assessed | Property, cash flow, sponsor | The same, plus scored commitments |
| Maximum amortization | 40 years on an existing property, 50 years on new construction, with no points needed | 40 years at 50 points, 45 at 70, 50 at 100, so the gain is on existing properties rather than new construction |
| Recourse | A loan at or below 65% of lending value may be considered non-recourse | Limited recourse at 100 points, and also at or below 65% loan-to-value or for a non-profit or social-mandate borrower |
| Ongoing obligations | Ordinary loan covenants | Affordability, energy or accessibility commitments |
| Best suited to | Projects wanting flexibility | Projects that can hold commitments for years |
Neither is better in the abstract. A project that cannot comfortably hold an affordability commitment should not buy amortization with one.
The citable fact: MLI Select exchanges long-term affordability, energy or accessibility commitments for longer amortization, a higher loan amount and a limited-recourse option at the top tier.
This page sits in the Ask a Broker collection, where a licensed broker answers one question per page.
A minimum of 50 points. Points come from affordability, energy efficiency and accessibility, and can be combined across the three criteria to reach a tier.
Up to 95% loan-to-cost with a 40-year amortization, on a recourse basis. Higher tiers extend the amortization and can open a limited-recourse option.
The ladder is measured on loan-to-value rather than loan-to-cost. At 50 points an existing property reaches up to 85% loan-to-value, and at 70 points up to 95%.
A minimum of five units, except retirement homes, which require a minimum of 50 units or beds.
Yes. Committing 40% of units at rents tied to median renter income earns 50 points, which is the entry threshold on its own.
It runs for a fixed period set by the programme, and a longer commitment earns additional points. It is a contractual obligation that continues well after funding.
On reduction against a baseline. For an existing property a 15% reduction earns 20 points, with higher reductions earning more. New construction is measured against national code standards instead.
No. Accessibility starts at 20 points and is capped below the other criteria, so it tops up a score rather than reaching the threshold alone.
Student housing is eligible against the energy efficiency and accessibility criteria. The programme also covers market rental, supportive housing, single-room occupancy and retirement homes.
It restricts the lender’s claim largely to the property and the project rather than reaching the sponsor personally. It becomes available at the top point tier.
At concept stage. Most points are designed into a project rather than added afterwards, and the cheaper energy points usually disappear once the design is fixed.
No. Five units is the floor. A four-unit building is financed as residential property, under different rules and a different process.
No. Chat on this page connects you to a real licensed broker. During business hours you get a live answer, and outside them a broker replies directly.
No AI persona, no call centre queue, no bank script. A licensed broker, on chat, right now.